logo
Links
Search
GJC75-30 II  Truck Mounted Double Pump Cementing Unit
GJC75-30 II Truck Mounted Double Pump Cementing Unit
  • GJC75-30 II Truck Mounted Double Pump Cementing Unit
  • GJC75-30 II Truck Mounted Double Pump Cementing Unit
  • GJC75-30 II Truck Mounted Double Pump Cementing Unit
·This truck is a new generation developed by Jereh Group independently. It assimilates the advanced overseas technologies and adopts twin engines and twin pumps configuration to realize cementing operation with high pressure and discharging volume. This truck is mainly applied to the land oilfield applications. 

·AMS 1.5 single variable continuous automatic density mixing system or AMS 2.0 dual variable continuous automatic density mixing system is optional to be equipped on this truck for easy operation and high working efficiency. It also realizes the function of easy shifting between manual and automatic operation as well as data acquisition.

·The triplex plunger pump is located on the rear of this truck, which is easy for maintenance.

·The fluid end of the triplex plunger pump and packing of the centrifugal pump are lubricated through pressurized oil supply. The waste oil tank is designed for environment protection consideration.

·Contrast to the congeneric products, the truck has the feature of good appearance, convenient operation and stable durability.

·Find more related products?
GJT70-34II trailer mounted double pump cementing unit 
GJC44-17 truck mounted single pump cementing unit
GJQ44-21 truck mounted single pump cementing unit
GJC44-21 truck mounted single pump cementing unit
GJT95-27II trailer mounted double pump cementing unit
GJC70-34Ⅱ truck mounted double pump cementing unit

Legal notice | Patent | Link | Contact Us | Site Map
Copyright © 2010 Jereh Petroleum Equipment Technologies CO., Ltd.
[鲁ICP备09070735号] www.jereh-pe.com